PlumbingIQ
Sign InGet Started
PlumbingIQ

Learning

DashboardFlashcardsMy Progress

Testing & Mocks

Mock Exams

Account

Upgrade to Pro

⭐ Upgrade to Pro - £19

Unlock all lessons and mock exams to pass Level 2 + Level 3 theory exams.

Upgrade now
Lesson 15 of 17

Fully Pumped Systems: The S-Plan

Read through the material below, then test your understanding.

Module Lessons

Central Heating

Lesson Overview

The S-Plan is a fully pumped central heating and hot water system that uses two independent two-port motorised valves. It provides complete, separate control over heating and hot water circuits while preventing fuel wastage through boiler interlock.

Learning Objectives

Identify the layout, pipework arrangements, and components of an S-Plan central heating system.

Explain the operating sequence of two-port motorised zone valves and how boiler interlock is achieved.

Understand the installation and function of thermostats, automatic bypass valves, and system expansion devices.

PlumbingIQ

Interactive City & Guilds Level 2 and Level 3 plumbing lessons, flashcards and mock exams, built for UK students and professionals.

© 2026 PlumbingIQ. All rights reserved.