Lesson 21 of 31

Installing Main Protective Bonding

Read through the material below, then test your understanding.

Module Lessons

Electrical Principles & Diagnostics

Lesson Overview

Main protective bonding connects incoming metallic services to the main earthing terminal to ensure equal electrical potential and prevent dangerous touch voltages.

Learning Objectives

Identify extraneous conductive parts requiring main protective bonding and their cable sizing.

State the positioning rules and connection requirements for bonding incoming gas, water, and oil services.

Explain the safety procedures for installing, supporting, and looping bonding conductors.

Unlock the full lesson & knowledge check

Get lifetime access to every Level 2 & 3 lesson, 3500+ total questions, and timed City & Guilds mock exams.

Get Pro Access (£19)

Already have Pro? Sign in

PlumbingIQ

Interactive City & Guilds Level 2 and Level 3 plumbing lessons, flashcards and mock exams, built for UK students and professionals.

© 2026 PlumbingIQ. All rights reserved.